Two flagship projects anchor the current pipeline. A broader operating history across four Western states supports them. Three decades of real estate experience underwrites both.

Flagship Project

Traditions — Dayton, Nevada

A 230-acre, ~350-unit master-planned PUD in Lyon County, Nevada, positioned at the doorstep of the Tahoe-Reno Industrial Center and its anchor employers (Tesla, Google, Amazon, Apple).

Traditions North rendered site plan, Dayton Nevada

Repositioned lender-owned land into a phased, builder-ready PUD.

GF Development acquired the underlying land basis and is advancing PUD approval, civil engineering, and builder engagement across three phases with senior local land planning and civil engineering partners.

The value creation comes from the entitlement spread, taking lender-owned raw land through PUD, infrastructure design, and platting, then delivering finished lots to national and regional homebuilders already active in the Dayton corridor.

  • LocationDayton, NV (Lyon County)
  • Acreage±230 acres
  • Density~350 units across 3 phases
  • Lot Mix4,500 / 6,000 / 8,000 / 12,000 sq ft
  • StatusActive entitlement
Flagship Project

Brio Vista — Boise, Idaho

Brio Vista aerial rendering, 36-lot hillside subdivision, Boise Idaho

36 hillside homesites in the path of Boise's fastest-growing corridor.

Brio Vista is a 36-lot residential infill subdivision perched on a hillside in Ada County, Idaho, minutes from downtown Boise and squarely in the Treasure Valley's dominant growth trajectory. The project takes an underutilized parcel through full entitlement, subdivision, and infrastructure delivery, exiting to a national homebuilder at finished-lot takedown.

  • LocationAda County / Boise, Idaho
  • Lots36 hillside homesites
  • DesignMountain modern, zero-scape, tiered retaining walls
  • StatusActive entitlement, hillside review, P&Z pending
  • ExitNational homebuilder lot takedown at preliminary plat
  • MarketTreasure Valley, #1 growth corridor in Idaho
  • TeamRiver Ridge Engineering, Atlas Geotech, local land use counsel
Operating History

Building the operating foundation.

Before focusing on master-planned entitlement, GF Development executed a series of smaller land and infill projects across the Western U.S.

Idaho County Recreational Subdivision

Idaho County, ID

±154 acres, 6 parcels. Lot design, access, and utilities. 80% sold in the first 30 days of marketing.

Boise Urban Infill

Ada County, ID

±10 acres, 45 lots. Annexation, rezoning, utility design, unlocking density in a constrained market.

Cowlitz County Rural Subdivision

Cowlitz County, WA

±20 acres, 4 lots. Private road, shared well, septic engineering. Doubled value through infrastructure.

Washington County Land Split

Washington County, ID

±17 acres, 3 parcels. Entitlement and access design to maximize lot configuration and value.

Roy Buildability Conversion

Pierce County, WA

±5 acres. Wetland delineation, septic engineering, site planning. Converted unbuildable site into fully permitted homesite.

Storm Lake Lakefront Redevelopment

Thurston County, WA

±0.25 acres. Critical area study, geotech, septic design. Established buildability for premium resale.

Inglewood Urban Redevelopment

Los Angeles County, CA

Two Central Ave parcels. Environmental remediation, entitlement, and remarketing for affordable housing.

Chatsworth Residential Flip

Los Angeles County, CA

±0.42 acres, 3,456 sq ft home. Acquisition, full renovation, resale. 48% margin in 7 months.

Founder's Career

Three decades. Three companies. Two exits.

GF Development sits on top of a 30-year real estate career. The firms below were founded and operated by Greg Francis before the current focus on land development. More on the About page.

1997–2005

Mortgage Banking

Loan advisor at a top Northern California mortgage bank and broker. Founded and sold a Lake Tahoe residential and construction lending brokerage.

2003–2010

Luxury Homebuilding

Custom luxury homes delivered across Lake Tahoe and Truckee through architecturally tailored prefabricated residential systems.

2014–2024

Specialty Construction

Founded and scaled a national specialty construction firm from two to fifty employees over a decade. Sold equity in 2024.

We work with landowners, brokers, and capital partners across our active markets.

Get in Touch